JP Piping Systems Pty Ltd undertakes larger projects for the installation of all Gas, Pneumatic and Instrumentation, Poly Lines, Fire Water, Dust Suppression, Floc Lines, Fuel Lines and any Small Bore Piping – To date we have piped out over 25 major Coal Preparation plants in Queensland’s Bowen Basin and New South Wales. Sedgman also engaged us to carryout Project Management work on the Benga Project in Mozambique.

JP Piping Systems Pty Ltd has a large range of plant and equipment and experienced staff who are specialists in managing these projects through design stage to practical completion and beyond. We are proud to say that all our projects have been completed successfully on time and on budget.

JP Piping Systems Pty Ltd has successfully completed projects up to $15.0M and has the capability and expertise to discuss any size project. We implement and maintain correct business and management practices (through our triple accreditation), together with adequate asset backing, to ensure financial stability and long-term sustainability. We are based in Mackay QLD, and supply and install all over Australia.

Projects Completed

DATECLIENTPROJECTSCOPE OF WORK

April – August 2024 

Sedgman Pty Ltd

Mt Pleasant Mine (NSW)

Small Bore Piping

January 2022 – August 2024Sojitz BlueGregory Mine (QLD)Maintenance Works
October 2021 – August 2024Middlemount CoalMiddlemount Mine (QLD)Shutdown Works
April 2018 – August 2024Hail Creek CoalHail Creek Mine (QLD)Shutdown Works
July 2023 – May 2024SCJVOlive Downs Mine (QLD)Supply & Install Small Bore Piping
DATECLIENTPROJECTSCOPE OF WORK
August 2022 – July 2023Lenton Joint VentureBowen Coking Coal – Burton Mine (QLD)Supply & Install Various Piping Works
July 2022 – June 2023SedgmanOlive Downs Mine (QLD)Site Office Plumbing
November 2022 – June 2023WDT Mackay (QLD)Supply & Install Fire Piping on Conveyors for Olive Downs Project
November 2022 – May 2023ThiessLake Vermont Coal Project (QLD)Fire Water Tanks
November 2022 – Feb 2023Kestrel CoalKestrel Mine (QLD)Supply & Install 2.5km Water Pipeline Replacement
August 2022 – January 2023DRA Projects AustraliaCarmichael Mine (QLD)Install Small Bore Piping
June 2022 – August 2022CMK ContractingMarlborough (QLD)Supply and Install Poly for Wind Farm
DATECLIENTPROJECTSCOPE OF WORK
August 2021 – December 2021Pioneer Valley WaterVarious (QLD)Water Pump Servicing
October 2021 – December 2021WDT Engineers Mackay (QLD)Install Fire Piping on Conveyors for Byerwen Project
September 2021 – October 2021Sedgman Pty LtdJellinbah Mine (QLD)Small Bore Piping
February 2021 – October 2021Wallis GroupVanderfield Mackay (QLD)Install new fire system
September – 2021Mackay Base HospitalMackay (QLD)Install plumbing for Pathology Analyser
January 2018 – September 2021Sedgman Pty LtdMiddlemount Mine (QLD)Various small bore piping, Maintenance & Shutdown Works
August – 2021BMACaval Ridge (QLD)Install Hot taps
September 2020 – July 2021Martinus RailVarious sites (QLD)Maintenance works including installing pipework and poly tanks.
October 2020 – June 2021Sedgman Pty LtdByerwen (QLD)Small Bore Piping
June 2021 – July 2021MJM DevelopmentsCaval Ridge Mine (QLD)Pipe repair – poly welding
April 2021 – July 2021Eton irrigationVictoria Plains (QLD)Poly line installation
April – 2021Pioneer Valley WaterCattle Creek, Mackay (QLD)Water Meter Installation
December 2020 – January 2021Thiess Pty LimitedLake Vermont (QLD)4.5km Poly Welding
DATECLIENTPROJECTSCOPE OF WORK
September 2020 – November 2020BMCSouth Walker Creek Mine (QLD)Flowmeter Installation, Shutdown works.
February 2020 – July 2020BHP Biliton Mitsubishi AllianceCaval Ridge Mine (QLD)Shutdown works, 1Mtr poly fabrication.
December – 2019Farrellys Construction ServicesByerwen (QLD)Wash plant installation works.
August 2020 – December 2019G&S Engineering Pty LtdGregory Mine (QLD)Run poly pipe for Gland Water, Pipe Restoration in Thickner Tank, Installation of Poly Pipes, Fabricate new spools and install spillage pump line, Fabricate spray bar wate feeds.
May 2019 – November 2019BHP Billiton Misubishi AllianceCaval Ridge Mine (QLD)CHPP, Raw Coal Area
 
Installation, Product Stockpile Wash down, Bracket Rectification, Hydro Testing, Shutdown Works
July 2019 – November 2019G&S Engineering Pty LtdDargues Gold Mine, Braidwood (NSW)Poly Welding, Threading Pipe, Installation of Poly and Galv Pipe, Plant Air, Gland Water, Slurry, Portable and Raw Water.
April 2019 – November 2019Sedgman Pty LimitedMt Pleasant Mine, Muswellbrook (NSW)Installation of Small Bore Piping Systems
February 2018 – June 2019G&S Engineering Pty LtdCaval Ridge Mine (QLD)Piping – Stockpile Product Coal Pipe Diversion, Buried Water Line Crossings, Harrows Creek Crossing, Surge Bin Waterline
April 2018 – February 2019G&S Engineering Pty LtdMt Pleasant Mine, Muswellbrook (NSW)Installation of Small Bore Piping, Dust Suppression Station, Fire Systems, Flocculant Lines, Gland Water, Air, Process Water
DATECLIENTPROJECTSCOPE OF WORK
April 2018 – October 2018CPB ContractingSouthern Circuit, Caval Ridge (QLD)Installation of Fire Systems, Underground Poly
November 2016 – October 2018AdaniBorefield Project, Abbott Point (QLD)Installation of 14km 180mm pipeline, Fire Line, 225mm poly, Sump discharge poly, Permanent Water, Temporary Line Stage 2
February 2018 – May 2018G&S Engineering Caval Ridge (QLD)Installation of Poly Screen Shrouds, Relocate Product Stockpile Sprays, Downpipe Modifications, Process Water Overflow Slab, Tie-In Fire and Gland Water, Bollards, 250mm poly line at Reclaimer,
January – 2018Rio TintoHail Creek (QLD)Relocate Air Lines and Water Lines
January – 2018SedgmanMiddlemount (QLD)Supply and Install Hose Reels
DATECLIENTPROJECTSCOPE OF WORK
September – 2017All Pumps Sales and ServiceProserpine Sewage Treatment Plant (QLD)Installation of Fire Pumps and Pipework
April – 2017SEW – EurodrivePaget (QLD)Supply and Install Air System
November 2016 – December 2016BMC South WalkerMRA Project, South Walker (QLD)40km pipe line for landowners water troughs
November 2016 – February 2017BHP DauniaDam 4C Poly Pipe Relocation (QLD)Supply & Relocate 355mm Poly and Pump and Mechanicals
April – 2016Rio TintoHail Creek (QLD)Installation of additional Hose Down for Sizing Stations
April 2016 – September 2016Downer GroupBakers Creek & Bucasia – Sewage Treatment Plants (QLD)Supply and Install Manifolds, Chemical lines, Injection Quill, Water Lines, Poly Tank
March – 2016BMA Daunia Daunia (QLD)Installation of Poly Tanks
February – 2016Cromford PipeMackay (QLD)Installation of Water Tanks and improvement of current Chiller Piping System.
January – 2016Sedgman MilleniumMillenium (QLD)Installation of Water Line
November 2015 – March 2016BMADaunia (QLD)HV Wash Rectification Works
August 2015 – February 2016MainteckMoranbah North (QLD)Piping Shutdown Works – CX107
 
CHPP Upgrade
June 2015 – March 2016Tyco Australia Pty Ltd, t/a WormaldSino Iron Ore Mine (WA)Installation and Commissioning Works for Fire Protection Systems
August 2015 – November 2015G&S EngineeringRolleston Coal (QLD)Various Pipework
November 2013 – July 2015G&S EngineeringHay Point Expansion (QLD)Fire Lines, Compressed Air Lines, Raw Water and Sewer Poly Lines, Shutdown Pipework Tie-Ins and Outloading additional pipework for Fire System, Off Shore Hydro Testing of all piping.
March 2015 – June 2015Sedgman LimitedCaval Ridge Mine (QLD)Process Water Pump Upgrade, Conduits & Pump out line, Mechanical Piping and Minor Civil Works
November 2014 – May 2015Bechtel/McConnel DowellHay Point Expansion (QLD)Off shore Hydro testing of all Piping
November 2014 – April 2015 York CivilHay Point Expansion (QLD)Final Civil Works Onshore, Welding of PE, Pipe Drainage and supply of fittings.
July 2014 – April 2015Tyco Australia Pty Ltd t/a WormaldPeak Downs Mine (QLD)Fire System Upgrade and Civils
September 2014 – March 2015Thiess Sedgman Joint VentureBoggabri Coal Expansion (NSW)Fire Lines, Compressed Air Lines, Process Lines, Floc Lines, Raw Water Poly Lines
March – 2015Team EngineeringGrosvenor Mine (QLD)Roof Sheeting, Wall Cladding, Ridge Vent, Gutters, Downpipes and Flashings.
DATECLIENTPROJECTSCOPE OF WORK
October 2013 – September 2014G&S EngineeringCaval Ridge Mine (QLD)Fire Lines, Compressed Air Lines, Process Lines, Floc Lines, Raw Water Poly Lines, Civil Works and Concreting.
June 2014 – August 2014SedgmanGoonyella Riverside Mine Spiral upgrade for CHPP (QLD)Small Bore Services, Compressed Air Lines, Fire Lines
March 2014 – July 2014BMADaunia Mine (QLD)Plumbing Rectification Works, LV & HV Wash stations works
March 2014 – August 2014SedgmanDaunia Mine (QLD)Floc System Upgrade, MIBC Flowmeter Install
September 2013 – January 2014ThiessCaval Ridge Mine CHPP (QLD)Fire Lines, Compressed air Lines, Process Lines, Floc Lines, Raw Water Poly Lines
October 2103 – March 2014ThiessCaval Ridge Mine MIA (QLD)Heavy Vehicle and Light Vehicle Wash Bay & Fuel Lines
November 2013 – December 2013SedgmanMungari Gold (WA)Project Management – Piping
February 2013 – April 2013SedgmanSaraji Mine, Reflux Classifier Project (QLD)Site Offices Plumbing, Fluidising Water, Small Bore Process Piping, Instrument & Service Air, Wash Down System, Fire System
January 2013 – March 2013York CivilDaunia Mine (QLD)Poly Welding – 450mm lines
January 2013 – April 2013Downer EDIDaunia Mine (QLD)Plumbing & Drainage, Administration  Buildings & Workshop
February 2013 – November 2013ThiessDaunia Mine (QLD)Heavy Vehicle and Light Vehicle Wash Bay & Fuel Lines
September 2012 – December 2012Team Engineering ServicesClermont Coal Dump Hopper Upgrade (QLD)Fire Lines, Dust Suppression, Raw Water Lines.
July 2102 – December 2013Downer/BechtelSth Walker Mine Flotation Cell Project (QLD)Fire Lines, Compressed air Lines, Process Lines, Floc Lines, Raw Water Poly Lines
February 2011 – June 2012BMCSth Walker Mine (QLD)Up Grade all Piping in CHPP
January 2011 – 2013Anglo CoalMoranbah Nth CHPP (QLD)Up Grade Fire and air Systems in CHPP and Conveyors, Fire System Audit
March – 2012GoldingsDaunia Mine (QLD)3.5km 250mm Dewatering Poly Lines
January 2011 – 2013Anglo CoalMoranbah Nth CHPP (QLD)Up Grade Fire and air Systems in CHPP and Conveyors, Fire System Audit
February 2011 – June 2012BMCSouth Walker Mine (QLD)Up Grade all Piping in CHPP
October 2011 – March 2012Thiess Sedgman Joint VentureBengalla CHPP Expansion (NSW)Install Floc Lines , Fire Lines, Process Lines and Compressed air lines
July 2011 – October 2011SedgmanBenga Project MozambiqueProject Management – Piping
January 2011- October 2011SedgmanNarrabri Coal Mine (NSW)Install Floc Lines , Fire Lines, Process Lines and Compressed air lines
January 2010 – 2013Roche Downer EDI MiningMillennium Mine (QLD)Plumbing, Supply of Poly Pipe and Installation
DATECLIENTPROJECTSCOPE OF WORK
September 2009 – November 2009WALZCarborough Downs CHPP Project (QLD)Install Airlines & Piping
July 2009 – December 2009SedgmanCoppabella Tailings Dam (QLD)Install Pumps, Poly Lines, Drainage
2009Xstrata ZincMt Isa Mines (QLD)Supply contract for Poly Pipe and Fittings
June 2009 – September 2009SedgmanSonoma Mine Micro Cell Upgrade (QLD)Fire lines, Airlines, Diesel lines, Process Water Lines, Roofing, Floc Lines etc.
April 2009 -July 2009SedgmanBengalla Mine Upgrade (NSW)Install Fire lines, Dust Suppression , Roofing and Poly lines
2008SedgmanBlair Athol (QLD)Supply& Install Fabricated Poly Pipe Items for CHPP
2008Hamilton IslandDent Island Golf Course Project (QLD)Supply approx.’ 500K of Poly Pipe, Valves and E/F Fittings
2008SedgmanMillennium Mine (QLD)Shutdown works, Poly lines, Fire Lines etc
2008SedgmanCoppabella Mine (QLD)Ongoing shutdown works, Co-disposal lines and Poly lines in CHPP
April 2008 – June 2008Thiess Sedgman Joint VentureLake Vermont (QLD)Install Fire Services off site for Conveyor Galleries.
June 2008 – September 2008SedgmanCoppabella Mine (QLD)Upgrade Fire Service in Tunnel
January 2008 – June 2008SedgmanMiddlemount Coal (QLD)Site Set up of Offices, Air, Water, Fire Water, Poly Mains.
October 2007 – November 2007SKMSolomon IslandsInstallation of 8km 160mm, 125mm Poly Water Main and Pump Stations
November 2007 – March 2008Metals Finance CorporationLucky Strike Nickel Project30km Poly Pipe line from Burdekin River to new mine site
July 2007- CurrentSedgmanMillennium Coal (QLD)Providing CHPP Plant Operators
July 2007 – June 2008Thiess Sedgman Joint VentureLake Lindsay Coal Mine (QLD)Installation of Poly Compressed Airlines, Fire Water, Floc lines, Roofing and Wall Cladding of CHPP and Train Load Out.
July 2007 – January 2008Team Engineering ServicesDalrymple Coal Terminal Stacker a d Reclaimer Upgarde (QLD)Re pipe Stacker Reclaimer in S/S Pipe for, Fire Water and Dust Suppression.
July 2007- January 2008SedgmanSonoma Mine (QLD)Installation of Compressed Air lines, S/S Fire water. Poly Waterlines, Roofing and Poly Drains.
 
Site set up of all Offices, Sewer Plant and Crib Rooms
March 2007- 2010SedgmanCoppabella CHPP Piping upgrade (QLD)Replace Air, Water lines with Poly. S/S and Victaulic.
February 2007- December 2007Thiess Sedgman Joint VentureDawson Alliance CHPP (QLD)Compressed Air lines, Fire Water, Dust Suppression, Floc Lines, Poly Fire Lines, Sewer Lines, Coolfit lines, Raw Water lines, Washdown lines, Poly Drains.
November 2006- January 2007SedgmanAcland CHPP (QLD)Compressed Poly Air lines, Floc lines, Fire Lines
March 2006 – October 2006Excel CoalMillennium Mine CHPP (QLD)Compressed Air, Dust Suppression, Small Bore Piping and Fire Services
November 2005 – April 2006Thiess Sedgman Joint VentureSaraji CHPP Expansion (QLD)Compressed Air and Fire Water Poly Lines
January 2006 – June 2006O’Donnell GriffinWater Reticulation Hail Creek Expansion (QLD)Poly Lines, Pontoons, Dams and Pump work
June 2005 – September 2006Thiess Sedgman Joint VentureHail Creek Expansion (QLD)CHPP, Administration Building and Workshops
March 2005 – September 2005Parrotta EngineersBE Project – Workshop Facilities and Administration Building (QLD)Sewerage, Storm Water, Fire Water and Plumbing
September 2004 – January 2005SedgmanCurragh CHPP Upgrade (QLD)Compressed Air lines and Poly lines.
July – 2004SedgmanDe-Watering Plant Dartbrook Coal Mine Hunter Valley (NSW)Compressed air, Potable Water Lines.
December 2003—January 2004Thomas Borthwicks & Sons Meat worksChristmas shutdown (QLD)Re-design and install Sterilizer Poly Drainage System .
December – 2003HF HandsGregory Mine. (QLD)Roofing and Wall cladding.
 
Wash plant expansion
August – 2003Parrotta EngineeringMoorvale Coal Project (QLD)Re-location of Leighton’s work shop
August 2003—November 2003SedgmanMoorvale Coal Project (QLD)Fire Lines, Compressed air Lines, Process Lines, Floc Lines, Raw Water Poly Lines
March 2003—September 2003Thiess Sedgman Joint VentureHail Creek Coal Project (QLD)Fire Lines, Compressed air Lines, Process Lines, Floc Lines and Raw Water. Roofing and cladding, Water installation, Fire service installation.
December 2002— March 2003Parrotta EngineeringCCME Workshop and Offices expansion. (QLD)Roofing, Wall Cladding, Sewerage, Hot and Cold Water.
November 2002—February 2003Parrotta EngineeringCoppabella Coal Mine. (QLD)Drainage, Compressed Air,
  
Work shop expansion.Fire services, Roofing and Wall Cladding, Lube lines.
November 2002—January 2003Thomas Borthwicks & SonsConstruction and Relocation of New Knocking Box (QLD)Compressed Air lines, Flow Return Water, Sterilizer water, Drainage, Stainless Steel installation.
  
  
  
  
September – 2002Thiess Sedgman Joint VentureSite Establishment for Hail Creek Coal Project. (QLD)Water, Pressurized Sewer Main connections to site offices.
May 2002 — Aug 2002Thomas Borthwicks and Sons Meat Works.General Maintenance (QLD)Water Reticulation, Cooling Towers, Compressed Air Installation, Roofing and Cladding.
 
 
February 2002 — March 2002SedgmanWash plant expansionInstallation of all Pneumatic Piping and Instrumentation.
 
Coppabella Coal Mine (QLD)
November 2001 – December 2001Barclay MowlemStage 5 DBCT ExpansionAll Stainless Steel Water Supplies for Dust Suppression and Fire Water.
  
PCQ. (QLD)160mm Electrofusion Poly Water lines.
  
 Pneumatics for Rail Receival.
March 2001 – June  2001O’Donnell Griffin/Oaky Creek  Coal Mine (QLD)All Pneumatics and Compressed Air supply to Instruments.
   
SedgmanNew Wash PlantDrainage for Wash Plant and Tunnels.
June 2000– September 2000Thomas Borthwicks & Sons Meat worksSeparation of sterilizing water.100mm Giberit HDPE Drainage Systems.
  
Construction of new Meat Meal load out facility.50mm gal’ pipe work.
  
 Roofing & Cladding.
November 1999 – March 2000Lacaba AhdenBHP Peak Downs Mine (QLD)All External & Internal Sheeting.
  
B.E. DraglineWall Cladding of B.E. Dragline
DATECLIENTPROJECTSCOPE OF WORK
November 1999 – December 1999Pacific HydraulicsBHP Hay Point (QLD)25mm – 50mm Gal Compressed  Air and Pneumatics
 
Kwik Drop System
 
Rail Receival
November 1999 – December 1999Team Engineering ServicesDalrymple Bay Coal Terminal Shutdown  SR4 / SR5 (QLD)Additional Water Dust Suppression and Belt Sprays
June 1999 – November 1999TransfieldMackay Raw SugarInstallation of Air and Water.25mm-65mm Gal Pipe for galleries. Installation of Air and Water for Ship loader.
  
Wharf Project (QLD)Drainage for transfer towers.
February – 1999Fraser EngineersI.P.S. (QLD)Installation of 650mm Duct for Exhaust Fans
November – 1998Pacific HydraulicsBHP Hay Point25mm – 50mm Gal Compressed  Air and Pneumatics
 
Kwik Drop System
 
Rail Receival (QLD)
June – 1998Pacific HydraulicsDalrymple Bay Coal Terminal (QLD)25mm – 50mm Gal Compressed  Air and Pneumatics
 
Kwik Drop System
 
Rail Receival
March – 1998Pacific HydraulicsDalrymple Bay Coal Terminal (QLD)25mm – 50mm Gal Compressed  Air and Pneumatics
 
Kwik Drop System
 
Rail Receival
January 1998 – July 1999Lacaba AhdenDalrymple Bay Coal Terminal (QLD)65mm Gal Water supply for Fire systems and Dust Suppression.
  
Stacker/Reclaimer SR4 and SR525mm Compressed Air and Pneumatics.
June 1997 – January 1998Lacaba AhdenBHP Cannington (QLD)25mm – 50mm Gal Pipework for Water, Fire Systems, Sprays and Pneumatics.
  
Ship Loader80mm PVC Vacuum System.